FERC License and Environmental Documents |
| 12/6/2007 |
FERC
Order Issuing License |
|
|
| 12/6/2007 |
FEIS |
|
|
| 12/6/2007 |
401
Certification |
|
|
| 12/6/2007 |
SWRCB
EIS Supplement |
|
|
| 12/6/2007 |
401
Certification Revision Sept. 2007 |
|
|
| 6/27/2008 |
Order Modifying License Appendix B |
|
|
License Required Plans |
| 12/17/2009 |
C35 Oyster Creek Stabilization Plan - DRAFT |
|
| 10/21/2008 |
C54 Visual Resource Management Plan - June 27, 2008 |
|
| 10/21/2008 |
C36 Esmeralda Creek Restoration and Stabilization Plan - DRAFT |
|
| 10/21/2008 |
C15
Intergrated Pest Management Plan |
|
| 07/20/2009 |
C37
Geomorphology Monitoring Plan |
|
| 07/20/2009 |
C63
Alder Spoils Plan |
|
| 06/27/2008 |
C57
Transportation System Mgmt |
|
| 06/27/2008 |
C58
Trails System Mgmt Plan |
|
| 07/11/2008 |
C39
Alder Creek Fish Screen Plan |
|
| 06/27/2008 |
C41
Canal Release Points |
|
| 06/27/2008 |
C33 Lake Aloha Downstream Ponds Trout Removal Plan |
|
| 06/27/2008 |
C37 Hardhead Monitoring Plan |
|
| 06/27/2008 |
C37 Water Quality Monitoring Plan |
|
| 06/27/2008 |
C65 Groundwater Monitoring Plan |
|
| 06/27/2008 |
C43 Canal Wildlife Fencing Plan |
|
| 06/27/2008 |
C44 Noxious Weed Plan |
|
| 06/27/2008 |
C46 Recreation Implementation Plan |
|
| 06/27/2008 |
C37 Foothill Yellow-Legged Frog Monitoring Plan |
|
| 06/27/2008 |
C13 Hazardous Substances Plan |
|
| 06/27/2008 |
C37 Water Temperature Monitoring Plan |
|
| 06/27/2008 |
C40 Streamflow and Reservoir Storage Gaging Plan |
|
| 06/27/2008 |
C53 Streamflow and Lake Level Information Plan |
|
| 06/27/2008 |
C59 Facility Management Plan |
|
| 09/21/2007 |
Lake
Aloha MYLF Monitoring Plan |
|
| |
|
|
Annual Reports |
| 12/17/2009 |
Kyburz Flow Fluctuation FYLF Report |
|
| 12/17/2009 |
Spillway 10 Flow Fluctuation FYLF Report |
|
| 12/17/2009 |
Spillway 47C Flow Fluctuation FYLF Report |
|
| 08/28/2009 |
Oyster Creek Sensitive Site Monitoring Report — August 2009 |
|
| 06/27/2008 |
2004 Amphibian Monitoring Program |
|
| 06/27/2008 |
2004 Hardhead Fishery Survey Data Report |
|
| 06/27/2008 |
2004 Lake Aloha Trout Survey |
|
| 06/27/2008 |
2005 Foothill Yellow-Legged Frog Surveys |
|
| 06/27/2008 |
2005 Hardhead Monitoring Report |
|
| 06/27/2008 |
2007 Ecological Resources Committee Annual Report |
|
| 06/27/2008 |
2007 Foothill Yellow-Legged Frog Monitoring Report |
|
| 06/27/2008 |
2007 Hardhead Monitoring Report |
|
| 06/27/2008 |
2007 Lake Aloha Mountain Yellow-Legged Frog Surveys |
|
| 06/27/2008 |
2007 Lake Aloha Trout Removal Surveys |
|
| 06/27/2008 |
2007 Wildlife Mortality Report |
|
| 06/27/2008 |
2007 Tunnel Groundwater Inspection Report |
|
| 07/31/2007 |
2004-2006
Annual Report |
|
| 07/31/2007 |
2006
Deer Mortality Report |
|
| 07/31/2007 |
2007
Lake Aloha Spills Report |
|
| 07/29/2005 |
2005
Amphibian Monitoring Report
|
|
| 11/16/2004 |
> 2004
Lake Aloha Initial Trout Survey and Removal Report
> Trout
Survey Presentation for ER |
|
Water
Operations |
| 04/11/2006 |
Water
Forecast and Operations Plan - 04/01 |
|
|
| 03/16/2006 |
Water
Forecast and Operations Plan - 03/16 |
|
|
| 03/01/2006 |
Water
Forecast and Operations Plan - 03/01 |
|
|
| 02/22/2006 |
Water
Forecast and Operations Plan - 02/01 |
|
|
| 02/22/2006 |
Water
Forecast and Operations Plan - 01/01 |
|
|
| 12/22/2005 |
Water
Forecast and Operations Plan - 12/22 |
|
|
| 12/01/2005 |
Water
Forecast and Operations Plan - 12/01 |
|
|
| 11/14/2005 |
Water
Forecast and Operations Plan - 11/14 |
|
|
| 11/01/2005 |
Water
Forecast and Operations Plan - 11/01 |
|
|
| 10/17/2005 |
Water
Forecast and Operations Plan - 10/17 |
|
|
| 10/03/2005 |
Water
Forecast and Operations Plan - 10/03 |
|
|
| 08/26/2005 |
Water
Forecast and Operations Plan - 9/05 |
|
|
| 07/15/2005 |
Current
Reservoir and Outflow Operations - 7/05 |
|
|
| 06/13/2005 |
Current
Reservoir and Outflow Operations - 6/05 |
|
|
| 05/01/2005 |
2005
Water Operations Plan |
|
|
| 01/24/2005 |
January
Project 184 Forecast & Operations Plan |
|
|
| 01/10/2005 |
December
Project 184 Forecast & Operations Plan |
|
|
| 06/30/2004 |
June
Project 184 Forecast & Operations Plan |
|
|
| 05/24/2004 |
May
Project 184 Forecast & Operations Plan |
|
|
04/19/2004 |
April
Project 184 Forecast & Operations Plan |
|
|
| 03/08/2004 |
March
Project 184 Forecast & Operations Plan |
|
|
| 03/01/2004 |
Project
184 CIP & Operations and Maintenance work planned for 2004-2006 |
|
|
| 05/30/2003 |
Project
184 Operating Plan |
|
|
Relicensing
Studies |
| 04/01/2004 |
Evaluation
of the Potential for Bald Eagle Nesting at Silver, Caples and Echo
Lakes |
|
|
| 04/01/2004 |
Minimum
River/Tributary Flow Requirements for a Below Normal Month: April |
|
|
| 04/01/2004 |
Summary
of Water Conditions - Dept. of Water Resources Board (Bulletin
120) |
|
|
| 04/22/2003 |
El
Dorado Relicensing Settlement Agreement |
|
|
| 2/06/03 |
Meeting
Summary: Hydrologic Modeling, January 16, 2003 |
Collaborative |
EID/Hydrologics |
| 2/06/03 |
Visual
Resources Study (revised) |
Collaborative |
EIP/EID |
| 12/19/02 |
Water
Temperature Modeling Report |
Collaborative |
ECORP/EIP/EID |
| 12/19/02 |
Geomorphology
Report: (5MB) |
Collaborative |
ECORP/EIP/EID |
| 12/05/02 |
Visual
Analysis (TM 16) |
Collaborative |
EIP/EID |
| 11/21/02 |
Caples
Creek Willow Recruitment Report |
Collaborative |
EIP/EID |
| 11/20/02 |
Whitewater
Boatable Days Analysis
(3 modeled scenarios) |
Collaborative |
EID/Hydrologics |
| 11/13/02 |
Silver
Lake Spring Flows: zip file |
Collaborative |
EID |
| 11/11/02 |
Fishing
Report (reservoirs) |
Collaborative |
RES/EID |
| 11/06/02 |
Conditions
Affecting Canal Maintenance Activities |
Collaborative |
EID |
| 11/05/02 |
Canal
Failure Report (historic) |
Collaborative |
RES/EID |
| 11/05/02 |
Drought
in the Sierra: zip file of PowerPoint presentation |
Collaborative |
El
Dorado Citizens for Water |
| 10/31/02 |
2002
Recreation Phone Survey (Contingent Use Analysis) |
Collaborative |
RES/EID |
| 10/31/02 |
Draft
Noxious Weed Management Plan |
Collaborative |
EIP/EID |
| 10/18/02 |
Recreation:
User Interviews Report |
Collaborative |
RES/EID |
| 10/18/02 |
2002
Business Owners Survey |
Collaborative |
RES/EID |
| 10/08/02 |
Proposed
Best Management Prectices for Sediment, Rock & Brush Removal
from the El Dorado Canal |
Collaborative |
EID |
| 09/25/02 |
2002
Lake Aloha Amphibian Survey |
Collaborative |
ECORP/EID |
| 09/16/02 |
Final
Willowcatcher Report |
Collaborative |
EID |
| 09/16/02 |
Hydro
Model Session #1 Revised Summary: 08/27/02 & 9/16/02 |
Collaborative |
EID |
| 09/06/02 |
Geotechnical
Report (Landslide Potential at El Dorado Canal) |
Collaborative |
EID |
| 09/06/02 |
Hydrologic
Modeling Session 2 Summary
|
Collaborative |
EID/Hydrologics |
| 09/06/02 |
Project
184 Access Road Inventory
- [zip file] |
Collaborative |
EID |
09/03/02
11/05/02 |
Canal
Failure Report (historic) |
Collaborative |
RES/EID |
| 09/03/02 |
Additional
Fisheries Tables: Tributary Age Classification, Fish density tables
( in lbs./acre) - [zip file] |
Collaborative |
RES/EID |
| 08/28/02 |
Lake
Aloha Recreation Users Survey - 08/28/02 |
Collaborative |
RES/EID |
| 08/28/02 |
Recreation
Cabin Survey
- 08/28/02 |
Collaborative |
RES/EID |
| 08/28/02 |
1999
Recreation User Survey
- 08/28/02 |
Collaborative |
RES/EID |
| 08/27/02 |
Hydro
Model Session #1 Revised Summary: 08/27/02 & 9/16/02 |
Collaborative |
EID/Hydrologics |
| 08/06/02 |
Hydro
Model Assumptions and User Guide - 08/06/02 |
Collaborative |
EID |
| 07/18/02 |
Silver
Lake Waterfowl Survey - 07/18/02 |
Collaborative |
EID |
| 07/02/02 |
Revised
bathymetric maps - Caples, Silver & Echo Lakes (zip file) |
Collaborative |
EID |
| 07/01/02 |
Valley
Elderbery Longhorn Beetle Survey pdf file |
Collaborative |
EID |
| 06/28/02 |
Wildlife
Crossings Report (Deer Migration Report) - 06/28/02 |
Collaborative |
EID |
| 06/18/02 |
Mammal
Habitat Report - pdf file (10Mb supporting map
zip file) |
Collaborative |
EID |
| 06/05/02 |
Deer
Fencing Report 20020604 (supporting map zip files 1
& 2) |
Collaborative |
EID |
| 06/05/02 |
Macroinvertebrate
Report and Tables (zip file) |
Collaborative |
EID |
| 05/31/02 |
Great
Gray Owl Habitat Report |
Collaborative |
EID |
| 05/09/02 |
Anticipated
Schedule - Relicensing Studies |
Collaborative |
EID |
| 05/09/02 |
Bathymetric
maps of upper lakes
(zip file) |
Collaborative |
EID |
| 05/06/02 |
Final
Hydrology Data Report |
Collaborative |
EID |
| 05/06/02 |
El
Dorado Collaborative Protocol |
Collaborative |
EID |
| 05/02/02 |
Revised
Amphibian Survey Protocols (May 1, 2002) |
Collaborative |
EID |
| 05/02/02 |
Pre-Project
Vegetation Analysis (From Vol 5, Appendix W, zip file) |
Collaborative |
EID |
| 04/18/02 |
Fisheries
Report
Dataset & Appendices
(zip file) |
Collaborative |
EID |
| 04/04/02 |
Deer
Mortality Records for El Dorado Canal 1983-1998 |
Collaborative |
EID |
| 04/04/02 |
Summary
Report For Northern Goshawk, California Spotted Owl, Peregrine Falcon,
Bald Eagle and Willow Flycatcher Surveys |
Collaborative |
EID |
| 04/04/02 |
Summary
of Noxious Weeds Report |
Collaborative |
EID |
| 04/04/02 |
Summary
of Field Surveys for Bats (Chiroptera) |
Collaborative |
EID |
| 04/04/02 |
Bat
Survey Location Maps (zip file) |
Collaborative |
EID |
| 03/15/02 |
DRAFT
- Project 184 Amphibian Survey Protocols |
Collaborative |
EID |
| 03/15/02 |
Draft
- Hydrologic Modeling Preliminary Data Report |
Collaborative |
EID |
| 03/15/02 |
Anticipated
Schedule - Relicensing Studies
Note
updated Schedule above 5/09/02 |
Collaborative |
EID |
| 03/15/02 |
High
Sierra Lakes Cultural Resources Survey |
Collaborative |
EID |
| 02/27/02 |
Quarterly
Report on Collaborative Process |
FERC |
EID |
| 01/31/02 |
Project
184 Relicensing Studies |
NA |
NA |
| 01/16/02 |
"Phase
I Report - Hydrological Model Design Project 184" - December
2001 |
NA |
NA |
| 11/18/01 |
El
Dorado Collaborative Protocol
Use
Collaborative Agreement 5/7/02 above |
NA |
NA |
| 10/25/01 |
Request
to Delay Processing Application and Conditions of El Dorado Project
Collaborative |
FERC
|
EID |
| 10/22/01 |
Draft
Special Study Timeline |
EID |
FERC |
| 10/19/01 |
Addendum
Relicensing Environmental Study Requests |
EID |
FERC |
| 09/20/01 |
Relicensing
Environmental Study Requests |
EID |
FERC |
| 03/09/01 |
Request
for Proposals |
EID |
Professional
Environmental Consulting Firms |
| NA |
SWRCB
Staff Collaborative Process Participation Statement |
SWRCB |
El
Dorado Collaborative Stakeholders |